RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2402025988 - Archived data from Tue, 11. August 2020 17:20:47 CEST


This is all the information about APD 2402025988. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2402025988
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D12
Break-through voltage: 414 V
Voltage for Gain 100 (T=+25°C): 385.3 V
Dark current: 7.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 6
Position in Box: 43
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 21. Sep 2018
Sent for analysis after irradiation: 02. Oct 2018
Return for assembly: none
   
Irradiation:  
Date: 27. Sep 2018
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: 28. Sep 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 385.5430203 V     T = -25 °C: 349.8380421 V
Voltage for Gain 150: T = +20 °C: 393.4356284 V     T = -25 °C: 357.295758 V
Voltage for Gain 200: T = +20 °C: 397.7972553 V     T = -25 °C: 361.504897 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.311212276 V-1     T = -25 °C: 5.125431034 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.285825886 V-1     T = -25 °C: 9.302345115 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.10964622 V-1     T = -25 °C: 16.03532904 V-1
Break-through voltage: T = +20 °C: 412.8086113 V     T = -25 °C: 376.5950104 V
   
Notes:


Version history

Time Author Change comment
29. Apr 2021 17:02:51 CEST oafedulidis Assigned to capsule by script
16. Feb 2021 12:26:23 CET jreher Updated box and position via API.
05. Feb 2021 10:48:23 CET jreher Updated box and position via API.
03. Feb 2021 18:14:41 CET jreher Updated box and position via API.
11. Aug 2020 17:20:47 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:30:27 CET jreher Updated APD location via API.
25. Nov 2019 17:11:23 CET jreher Updated box and position via API.
04. Jul 2019 11:05:39 CEST jreher Updated APD location via API.
12. Jun 2019 16:45:52 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:30:48 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:01:03 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:12:43 CET Tobias Corrected dark current unit.
02. Oct 2018 15:39:49 CEST markus.moritz
26. Sep 2018 12:31:34 CEST markus.moritz
12. Jan 2018 13:16:46 CET Tobias Imported from Hamamatsu datasheet.