RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2401025965 - Archived data from Wed, 03. February 2021 18:14:40 CET


This is all the information about APD 2401025965. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2401025965
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: At GSI for QE measurement
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D02
Break-through voltage: 417 V
Voltage for Gain 100 (T=+25°C): 388.4 V
Dark current: 4.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 6
Position in Box: 35
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 21. Sep 2018
Sent for analysis after irradiation: 02. Oct 2018
Return for assembly: none
   
Irradiation:  
Date: 27. Sep 2018
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: 28. Sep 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 388.4366434 V     T = -25 °C: 352.4112247 V
Voltage for Gain 150: T = +20 °C: 396.3361453 V     T = -25 °C: 359.9709409 V
Voltage for Gain 200: T = +20 °C: 400.7452981 V     T = -25 °C: 364.2651934 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.40572274 V-1     T = -25 °C: 4.556073262 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.716357892 V-1     T = -25 °C: 8.85467115 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.12183826 V-1     T = -25 °C: 14.23710303 V-1
Break-through voltage: T = +20 °C: 416.6375272 V     T = -25 °C: 380.3052497 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:48:22 CET jreher Updated box and position via API.
03. Feb 2021 18:14:40 CET jreher Updated box and position via API.
11. Aug 2020 17:20:45 CEST jreher Updated APD characteristics via API.
28. Nov 2019 10:39:10 CET jreher Updated APD location via API.
25. Nov 2019 17:11:23 CET jreher Updated box and position via API.
13. Jun 2019 14:19:16 CEST jreher Updated APD location via API.
12. Jun 2019 16:45:52 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:30:47 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:01:02 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:12:43 CET Tobias Corrected dark current unit.
02. Oct 2018 15:27:29 CEST markus.moritz
26. Sep 2018 12:25:46 CEST markus.moritz
12. Jan 2018 13:16:46 CET Tobias Imported from Hamamatsu datasheet.