RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2401025937 - Archived data from Tue, 11. August 2020 17:20:39 CEST


This is all the information about APD 2401025937. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2401025937
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2502027658/2401025937
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: C06
Break-through voltage: 411 V
Voltage for Gain 100 (T=+25°C): 382.3 V
Dark current: 5.3 nA
   
Screening Logistics:  
Available: No
Storage Box: 6
Position in Box: 7
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 21. Sep 2018
Sent for analysis after irradiation: 02. Oct 2018
Return for assembly: none
   
Irradiation:  
Date: 27. Sep 2018
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: 28. Sep 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.6202224 V     T = -25 °C: 346.9783636 V
Voltage for Gain 150: T = +20 °C: 390.4343611 V     T = -25 °C: 354.3850118 V
Voltage for Gain 200: T = +20 °C: 394.7752745 V     T = -25 °C: 358.5524947 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.478312944 V-1     T = -25 °C: 4.933952764 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.693430912 V-1     T = -25 °C: 9.18970272 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.22272102 V-1     T = -25 °C: 16.35759788 V-1
Break-through voltage: T = +20 °C: 410.609734 V     T = -25 °C: 374.2337895 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:48:19 CET jreher Updated box and position via API.
03. Feb 2021 18:14:37 CET jreher Updated box and position via API.
11. Aug 2020 17:20:39 CEST jreher Updated APD characteristics via API.
03. Apr 2020 09:44:54 CEST jreher Assigned to capsule by script
13. Feb 2020 14:23:36 CET jreher Updated box and position via API.
27. Nov 2019 19:30:24 CET jreher Updated APD location via API.
25. Nov 2019 17:11:20 CET jreher Updated box and position via API.
04. Jul 2019 11:05:36 CEST jreher Updated APD location via API.
12. Jun 2019 16:45:49 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:30:44 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:00:54 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:12:42 CET Tobias Corrected dark current unit.
02. Oct 2018 14:56:40 CEST markus.moritz
26. Sep 2018 12:10:23 CEST markus.moritz
12. Jan 2018 13:16:45 CET Tobias Imported from Hamamatsu datasheet.