RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2401025933 - Archived data from Tue, 08. December 2020 17:09:30 CET


This is all the information about APD 2401025933. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2401025933
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2401025933/2407026418
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: D05
Break-through voltage: 412 V
Voltage for Gain 100 (T=+25°C): 383.9 V
Dark current: 4.5 nA
   
Screening Logistics:  
Available: No
Storage Box: 6
Position in Box: 3
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 21. Sep 2018
Sent for analysis after irradiation: 02. Oct 2018
Return for assembly: none
   
Irradiation:  
Date: 27. Sep 2018
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: 28. Sep 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 384.1474274 V     T = -25 °C: 348.3809811 V
Voltage for Gain 150: T = +20 °C: 391.9772832 V     T = -25 °C: 355.8181524 V
Voltage for Gain 200: T = +20 °C: 396.3313337 V     T = -25 °C: 359.98025 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.57245041 V-1     T = -25 °C: 4.781580878 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.039319432 V-1     T = -25 °C: 9.659469625 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.08998215 V-1     T = -25 °C: 15.28509165 V-1
Break-through voltage: T = +20 °C: 411.6722208 V     T = -25 °C: 375.3055083 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:48:18 CET jreher Updated box and position via API.
03. Feb 2021 18:14:37 CET jreher Updated box and position via API.
08. Dec 2020 17:09:30 CET jreher Assigned to capsule by script
06. Oct 2020 16:51:40 CEST jreher Updated box and position via API.
11. Aug 2020 17:20:38 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:30:24 CET jreher Updated APD location via API.
25. Nov 2019 17:11:20 CET jreher Updated box and position via API.
04. Jul 2019 11:05:36 CEST jreher Updated APD location via API.
12. Jun 2019 16:45:49 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:30:44 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:00:54 CEST jreher Updated APD batch assignment via API.
25. Jan 2019 10:55:04 CET markus.moritz
03. Jan 2019 00:12:41 CET Tobias Corrected dark current unit.
02. Oct 2018 15:00:22 CEST markus.moritz
26. Sep 2018 12:12:10 CEST markus.moritz
12. Jan 2018 13:16:45 CET Tobias Imported from Hamamatsu datasheet.