RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2401025923 - Archived data from Tue, 11. August 2020 17:20:37 CEST


This is all the information about APD 2401025923. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2401025923
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2401025923/2419027428
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: E13
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 380.2 V
Dark current: 3.9 nA
   
Screening Logistics:  
Available: No
Storage Box: 5
Position in Box: 43
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 21. Sep 2018
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 379.7928375 V     T = -25 °C: 344.6551779 V
Voltage for Gain 150: T = +20 °C: 387.6408717 V     T = -25 °C: 352.0029713 V
Voltage for Gain 200: T = +20 °C: 392.005913 V     T = -25 °C: 356.1224917 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.413205166 V-1     T = -25 °C: 4.736463852 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.595332625 V-1     T = -25 °C: 9.722178655 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.94645024 V-1     T = -25 °C: 15.55959064 V-1
Break-through voltage: T = +20 °C: 408.0160042 V     T = -25 °C: 371.7771208 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:48:15 CET jreher Updated box and position via API.
03. Feb 2021 18:14:34 CET jreher Updated box and position via API.
11. Aug 2020 17:20:37 CEST jreher Updated APD characteristics via API.
31. Mar 2020 08:53:16 CEST jreher Assigned to capsule by script
13. Feb 2020 14:22:31 CET jreher Updated box and position via API.
13. Feb 2020 14:22:19 CET jreher Updated box and position via API.
27. Nov 2019 19:30:16 CET jreher Updated APD location via API.
25. Nov 2019 17:11:19 CET jreher Updated box and position via API.
04. Jul 2019 11:05:31 CEST jreher Updated APD location via API.
04. Jul 2019 10:44:33 CEST jreher Updated APD location via API.
12. Jun 2019 16:45:48 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:30:43 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:00:53 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:12:41 CET Tobias Corrected dark current unit.
26. Sep 2018 13:00:06 CEST markus.moritz
12. Jan 2018 13:16:45 CET Tobias Imported from Hamamatsu datasheet.