RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2401025920 - Archived data from Wed, 03. February 2021 18:14:34 CET


This is all the information about APD 2401025920. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2401025920
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2401025920/2206024103
Unit: #920 (barcode 1309009893)
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: B10
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 382.4 V
Dark current: 4 nA
   
Screening Logistics:  
Available: No
Storage Box: 5
Position in Box: 40
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 21. Sep 2018
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.945464 V     T = -25 °C: 346.6929652 V
Voltage for Gain 150: T = +20 °C: 389.8398299 V     T = -25 °C: 354.1037116 V
Voltage for Gain 200: T = +20 °C: 394.1520011 V     T = -25 °C: 358.3085329 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.050935917 V-1     T = -25 °C: 4.142885397 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.576191364 V-1     T = -25 °C: 8.896527563 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.97313618 V-1     T = -25 °C: 13.41029853 V-1
Break-through voltage: T = +20 °C: 409.633762 V     T = -25 °C: 373.6328043 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:48:15 CET jreher Updated box and position via API.
03. Feb 2021 18:14:34 CET jreher Updated box and position via API.
11. Aug 2020 17:20:36 CEST jreher Updated APD characteristics via API.
31. Mar 2020 08:52:22 CEST jreher Assigned to capsule by script
13. Feb 2020 13:37:22 CET jreher Updated box and position via API.
27. Nov 2019 19:30:16 CET jreher Updated APD location via API.
25. Nov 2019 17:11:18 CET jreher Updated box and position via API.
04. Jul 2019 11:05:31 CEST jreher Updated APD location via API.
04. Jul 2019 10:44:33 CEST jreher Updated APD location via API.
12. Jun 2019 16:45:47 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:30:43 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:00:46 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:12:41 CET Tobias Corrected dark current unit.
26. Sep 2018 12:53:00 CEST markus.moritz
12. Jan 2018 13:16:45 CET Tobias Imported from Hamamatsu datasheet.