RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2401025915 - Archived data from Mon, 17. August 2020 15:53:59 CEST


This is all the information about APD 2401025915. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2401025915
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G10
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 380.5 V
Dark current: 3.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 5
Position in Box: 35
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 21. Sep 2018
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.7299592 V     T = -25 °C: 345.2908778 V
Voltage for Gain 150: T = +20 °C: 388.5490094 V     T = -25 °C: 352.7476819 V
Voltage for Gain 200: T = +20 °C: 392.8839807 V     T = -25 °C: 356.8887718 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.70391449 V-1     T = -25 °C: 4.265968655 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.434579595 V-1     T = -25 °C: 9.333699788 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.2906141 V-1     T = -25 °C: 14.80863296 V-1
Break-through voltage: T = +20 °C: 408.0583575 V     T = -25 °C: 372.2633755 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:48:14 CET jreher Updated box and position via API.
03. Feb 2021 18:14:33 CET jreher Updated box and position via API.
07. Oct 2020 12:18:39 CEST jreher Assigned to capsule by script
17. Aug 2020 15:53:59 CEST jreher Updated box and position via API.
11. Aug 2020 17:20:35 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:30:15 CET jreher Updated APD location via API.
25. Nov 2019 17:11:18 CET jreher Updated box and position via API.
04. Jul 2019 11:05:30 CEST jreher Updated APD location via API.
04. Jul 2019 10:44:32 CEST jreher Updated APD location via API.
12. Jun 2019 16:45:47 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:30:42 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:00:45 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:12:41 CET Tobias Corrected dark current unit.
26. Sep 2018 12:55:22 CEST markus.moritz
12. Jan 2018 13:16:45 CET Tobias Imported from Hamamatsu datasheet.