RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2401025904 - Archived data from Fri, 05. February 2021 10:48:12 CET


This is all the information about APD 2401025904. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2401025904
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C09
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 381.4 V
Dark current: 4.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 5
Position in Box: 24
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 21. Sep 2018
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.412515 V     T = -25 °C: 345.8571364 V
Voltage for Gain 150: T = +20 °C: 389.2725858 V     T = -25 °C: 353.2415592 V
Voltage for Gain 200: T = +20 °C: 393.6031369 V     T = -25 °C: 357.3777051 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.446725964 V-1     T = -25 °C: 5.009479503 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.614700408 V-1     T = -25 °C: 8.944829337 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.51439026 V-1     T = -25 °C: 15.65133397 V-1
Break-through voltage: T = +20 °C: 409.5947514 V     T = -25 °C: 372.9716532 V
   
Notes:


Version history

Time Author Change comment
09. Feb 2021 11:19:23 CET jreher Assigned to capsule by script
05. Feb 2021 10:48:12 CET jreher Updated box and position via API.
03. Feb 2021 18:14:32 CET jreher Updated box and position via API.
18. Dec 2020 14:01:35 CET jreher Updated box and position via API.
11. Aug 2020 17:20:33 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:30:14 CET jreher Updated APD location via API.
25. Nov 2019 17:11:17 CET jreher Updated box and position via API.
04. Jul 2019 11:05:29 CEST jreher Updated APD location via API.
04. Jul 2019 10:44:32 CEST jreher Updated APD location via API.
12. Jun 2019 16:45:46 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:30:41 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:00:45 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:12:40 CET Tobias Corrected dark current unit.
26. Sep 2018 12:50:56 CEST markus.moritz
12. Jan 2018 13:16:45 CET Tobias Imported from Hamamatsu datasheet.