RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2320025882 - Archived data from Wed, 03. February 2021 18:14:31 CET


This is all the information about APD 2320025882. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2320025882
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C02
Break-through voltage: 407 V
Voltage for Gain 100 (T=+25°C): 379.6 V
Dark current: 5.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 26
Position in Box: 38
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 21. Sep 2018
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 378.8513126 V     T = -25 °C: 343.8532601 V
Voltage for Gain 150: T = +20 °C: 386.7489411 V     T = -25 °C: 351.2222056 V
Voltage for Gain 200: T = +20 °C: 391.1561841 V     T = -25 °C: 355.3789814 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.660868023 V-1     T = -25 °C: 5.04976819 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.146060657 V-1     T = -25 °C: 9.513392552 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.99251286 V-1     T = -25 °C: 14.44645896 V-1
Break-through voltage: T = +20 °C: 405.0987983 V     T = -25 °C: 370.5731773 V
   
Notes:


Version history

Time Author Change comment
21. Apr 2021 14:49:14 CEST oafedulidis Updated box and position via API.
05. Feb 2021 10:48:10 CET jreher Updated box and position via API.
03. Feb 2021 18:14:31 CET jreher Updated box and position via API.
11. Aug 2020 17:20:32 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:30:14 CET jreher Updated APD location via API.
25. Nov 2019 17:11:17 CET jreher Updated box and position via API.
04. Jul 2019 11:05:29 CEST jreher Updated APD location via API.
04. Jul 2019 10:44:31 CEST jreher Updated APD location via API.
12. Jun 2019 16:45:46 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:30:41 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:00:44 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:12:40 CET Tobias Corrected dark current unit.
26. Sep 2018 12:44:15 CEST markus.moritz
12. Jan 2018 13:16:44 CET Tobias Imported from Hamamatsu datasheet.