RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2320025877 - Archived data from Wed, 03. February 2021 18:14:30 CET


This is all the information about APD 2320025877. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2320025877
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2404026218/2320025877
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: D07
Break-through voltage: 407 V
Voltage for Gain 100 (T=+25°C): 378.5 V
Dark current: 6 nA
   
Screening Logistics:  
Available: No
Storage Box: 5
Position in Box: 11
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 21. Sep 2018
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 378.6737242 V     T = -25 °C: 343.7559035 V
Voltage for Gain 150: T = +20 °C: 386.4971078 V     T = -25 °C: 351.0875353 V
Voltage for Gain 200: T = +20 °C: 390.8654471 V     T = -25 °C: 355.2090844 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.416830064 V-1     T = -25 °C: 5.05917446 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.572210586 V-1     T = -25 °C: 9.499008496 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.8124092 V-1     T = -25 °C: 15.02753537 V-1
Break-through voltage: T = +20 °C: 406.4550676 V     T = -25 °C: 370.2778103 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:48:10 CET jreher Updated box and position via API.
03. Feb 2021 18:14:30 CET jreher Updated box and position via API.
11. Aug 2020 17:20:31 CEST jreher Updated APD characteristics via API.
03. Apr 2020 09:59:23 CEST jreher Assigned to capsule by script
19. Feb 2020 11:53:17 CET jreher Updated box and position via API.
27. Nov 2019 19:30:13 CET jreher Updated APD location via API.
25. Nov 2019 17:11:16 CET jreher Updated box and position via API.
04. Jul 2019 11:05:28 CEST jreher Updated APD location via API.
04. Jul 2019 10:44:31 CEST jreher Updated APD location via API.
12. Jun 2019 16:45:45 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:30:40 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:00:03 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:12:40 CET Tobias Corrected dark current unit.
26. Sep 2018 12:47:37 CEST markus.moritz
12. Jan 2018 13:16:44 CET Tobias Imported from Hamamatsu datasheet.