RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2320025874 - Archived data from Tue, 11. August 2020 17:20:30 CEST


This is all the information about APD 2320025874. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2320025874
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2316025536/2320025874
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: C06
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 379.6 V
Dark current: 7.7 nA
   
Screening Logistics:  
Available: No
Storage Box: 5
Position in Box: 8
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 21. Sep 2018
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 379.3098881 V     T = -25 °C: 344.3743204 V
Voltage for Gain 150: T = +20 °C: 387.1351356 V     T = -25 °C: 351.7273346 V
Voltage for Gain 200: T = +20 °C: 391.5202436 V     T = -25 °C: 355.8459433 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.543288411 V-1     T = -25 °C: 4.8273171 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.878798031 V-1     T = -25 °C: 9.860412064 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.45727983 V-1     T = -25 °C: 15.67320811 V-1
Break-through voltage: T = +20 °C: 407.4903488 V     T = -25 °C: 371.3196563 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:48:10 CET jreher Updated box and position via API.
03. Feb 2021 18:14:30 CET jreher Updated box and position via API.
11. Aug 2020 17:20:30 CEST jreher Updated APD characteristics via API.
31. Mar 2020 08:53:46 CEST jreher Assigned to capsule by script
13. Feb 2020 14:22:53 CET jreher Updated box and position via API.
27. Nov 2019 19:30:13 CET jreher Updated APD location via API.
25. Nov 2019 17:11:16 CET jreher Updated box and position via API.
04. Jul 2019 11:05:28 CEST jreher Updated APD location via API.
04. Jul 2019 10:44:30 CEST jreher Updated APD location via API.
12. Jun 2019 16:45:44 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:30:40 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:00:02 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:12:40 CET Tobias Corrected dark current unit.
26. Sep 2018 12:36:52 CEST markus.moritz
12. Jan 2018 13:16:44 CET Tobias Imported from Hamamatsu datasheet.