RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2320025865 - Archived data from Fri, 03. April 2020 10:07:03 CEST


This is all the information about APD 2320025865. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2320025865
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2403026131/2320025865
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: G05
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 380 V
Dark current: 4.6 nA
   
Screening Logistics:  
Available: No
Storage Box: 4
Position in Box: 50
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 21. Sep 2018
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 150: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 200: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 100: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 150: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 200: T = +20 °C: none     T = -25 °C: none
Break-through voltage: T = +20 °C: none     T = -25 °C: none
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:48:07 CET jreher Updated box and position via API.
03. Feb 2021 18:14:27 CET jreher Updated box and position via API.
11. Aug 2020 17:20:29 CEST jreher Updated APD characteristics via API.
03. Apr 2020 10:07:03 CEST jreher Assigned to capsule by script
20. Feb 2020 13:34:48 CET jreher Updated box and position via API.
27. Nov 2019 19:30:05 CET jreher Updated APD location via API.
25. Nov 2019 17:11:14 CET jreher Updated box and position via API.
04. Jul 2019 11:05:23 CEST jreher Updated APD location via API.
04. Jul 2019 10:44:24 CEST jreher Updated APD location via API.
12. Jun 2019 16:45:44 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:30:39 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:00:02 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:12:40 CET Tobias Corrected dark current unit.
26. Sep 2018 11:23:05 CEST markus.moritz
12. Jan 2018 13:16:44 CET Tobias Imported from Hamamatsu datasheet.