RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2320025863 - Archived data from Tue, 11. August 2020 17:20:28 CEST


This is all the information about APD 2320025863. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2320025863
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2410026688/2320025863
Unit: #896 (barcode 1309010103)
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: G07
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 381 V
Dark current: 6.2 nA
   
Screening Logistics:  
Available: No
Storage Box: 4
Position in Box: 48
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 21. Sep 2018
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.6743408 V     T = -25 °C: 345.3905117 V
Voltage for Gain 150: T = +20 °C: 388.4935876 V     T = -25 °C: 352.7774408 V
Voltage for Gain 200: T = +20 °C: 392.8512369 V     T = -25 °C: 356.9135419 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.429936321 V-1     T = -25 °C: 4.817527531 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.634956627 V-1     T = -25 °C: 9.786492713 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.9496563 V-1     T = -25 °C: 15.61412455 V-1
Break-through voltage: T = +20 °C: 408.6219963 V     T = -25 °C: 372.245938 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:48:06 CET jreher Updated box and position via API.
03. Feb 2021 18:14:27 CET jreher Updated box and position via API.
11. Aug 2020 17:20:28 CEST jreher Updated APD characteristics via API.
31. Mar 2020 08:51:53 CEST jreher Assigned to capsule by script
13. Feb 2020 14:19:55 CET jreher Updated box and position via API.
27. Nov 2019 19:30:05 CET jreher Updated APD location via API.
25. Nov 2019 17:11:14 CET jreher Updated box and position via API.
04. Jul 2019 11:05:23 CEST jreher Updated APD location via API.
04. Jul 2019 10:44:24 CEST jreher Updated APD location via API.
12. Jun 2019 16:45:43 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:30:39 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:00:02 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:12:40 CET Tobias Corrected dark current unit.
26. Sep 2018 11:24:10 CEST markus.moritz
12. Jan 2018 13:16:44 CET Tobias Imported from Hamamatsu datasheet.