RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2320025862 - Archived data from Tue, 11. August 2020 17:20:28 CEST


This is all the information about APD 2320025862. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2320025862
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: At GSI for QE measurement
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D08
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 379 V
Dark current: 5.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 4
Position in Box: 47
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 21. Sep 2018
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 379.0996517 V     T = -25 °C: 343.7893671 V
Voltage for Gain 150: T = +20 °C: 386.9209211 V     T = -25 °C: 351.1376826 V
Voltage for Gain 200: T = +20 °C: 391.2922704 V     T = -25 °C: 355.2659843 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.62787852 V-1     T = -25 °C: 5.048417638 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.126372118 V-1     T = -25 °C: 9.485169979 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.12928397 V-1     T = -25 °C: 14.98827314 V-1
Break-through voltage: T = +20 °C: 407.1496101 V     T = -25 °C: 370.5665486 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:48:06 CET jreher Updated box and position via API.
03. Feb 2021 18:14:27 CET jreher Updated box and position via API.
11. Aug 2020 17:20:28 CEST jreher Updated APD characteristics via API.
28. Nov 2019 10:39:10 CET jreher Updated APD location via API.
25. Nov 2019 17:11:14 CET jreher Updated box and position via API.
13. Jun 2019 14:19:15 CEST jreher Updated APD location via API.
12. Jun 2019 16:45:43 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:30:39 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:00:02 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:12:40 CET Tobias Corrected dark current unit.
26. Sep 2018 11:24:42 CEST markus.moritz
12. Jan 2018 13:16:44 CET Tobias Imported from Hamamatsu datasheet.