RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2320025858 - Archived data from Wed, 07. October 2020 16:40:31 CEST


This is all the information about APD 2320025858. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2320025858
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2320025858/2404026174
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: F09
Break-through voltage: 411 V
Voltage for Gain 100 (T=+25°C): 382.6 V
Dark current: 7.7 nA
   
Screening Logistics:  
Available: No
Storage Box: 4
Position in Box: 43
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 21. Sep 2018
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.2821876 V     T = -25 °C: 346.8374994 V
Voltage for Gain 150: T = +20 °C: 390.1211119 V     T = -25 °C: 354.223285 V
Voltage for Gain 200: T = +20 °C: 394.4929198 V     T = -25 °C: 358.3741367 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.532449451 V-1     T = -25 °C: 4.96945616 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.923168958 V-1     T = -25 °C: 9.269837224 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.58623918 V-1     T = -25 °C: 14.58689294 V-1
Break-through voltage: T = +20 °C: 409.654173 V     T = -25 °C: 373.1515076 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:48:06 CET jreher Updated box and position via API.
03. Feb 2021 18:14:26 CET jreher Updated box and position via API.
07. Oct 2020 16:40:31 CEST jreher Assigned to capsule by script
17. Aug 2020 15:51:09 CEST jreher Updated box and position via API.
11. Aug 2020 17:20:27 CEST jreher Updated APD characteristics via API.
20. Feb 2020 13:35:29 CET jreher Updated box and position via API.
27. Nov 2019 19:30:05 CET jreher Updated APD location via API.
25. Nov 2019 17:11:14 CET jreher Updated box and position via API.
04. Jul 2019 11:05:22 CEST jreher Updated APD location via API.
04. Jul 2019 10:44:24 CEST jreher Updated APD location via API.
12. Jun 2019 16:45:43 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:30:38 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:00:01 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:12:39 CET Tobias Corrected dark current unit.
26. Sep 2018 11:26:59 CEST markus.moritz
12. Jan 2018 13:16:44 CET Tobias Imported from Hamamatsu datasheet.