RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2320025853 - Archived data from Wed, 03. February 2021 18:14:26 CET


This is all the information about APD 2320025853. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2320025853
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2320025853/2503027738
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: B08
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 381.4 V
Dark current: 6.4 nA
   
Screening Logistics:  
Available: No
Storage Box: 4
Position in Box: 38
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 21. Sep 2018
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.761344 V     T = -25 °C: 346.4335702 V
Voltage for Gain 150: T = +20 °C: 389.5962886 V     T = -25 °C: 353.8202177 V
Voltage for Gain 200: T = +20 °C: 393.9410249 V     T = -25 °C: 357.9490716 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.410450735 V-1     T = -25 °C: 4.801916146 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.540764976 V-1     T = -25 °C: 9.751669838 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.90517247 V-1     T = -25 °C: 15.600193 V-1
Break-through voltage: T = +20 °C: 408.5848338 V     T = -25 °C: 372.3260619 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:48:05 CET jreher Updated box and position via API.
03. Feb 2021 18:14:26 CET jreher Updated box and position via API.
11. Aug 2020 17:20:26 CEST jreher Updated APD characteristics via API.
03. Apr 2020 10:07:06 CEST jreher Assigned to capsule by script
20. Feb 2020 13:34:49 CET jreher Updated box and position via API.
27. Nov 2019 19:30:04 CET jreher Updated APD location via API.
25. Nov 2019 17:11:14 CET jreher Updated box and position via API.
04. Jul 2019 11:05:22 CEST jreher Updated APD location via API.
04. Jul 2019 10:44:24 CEST jreher Updated APD location via API.
12. Jun 2019 16:45:43 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:30:38 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:00:01 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:12:39 CET Tobias Corrected dark current unit.
26. Sep 2018 11:18:37 CEST markus.moritz
12. Jan 2018 13:16:44 CET Tobias Imported from Hamamatsu datasheet.