RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2320025850 - Archived data from Tue, 11. August 2020 17:20:26 CEST


This is all the information about APD 2320025850. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2320025850
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2320025850/2609029869
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: C10
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 381.6 V
Dark current: 7 nA
   
Screening Logistics:  
Available: No
Storage Box: 4
Position in Box: 36
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 21. Sep 2018
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.629223 V     T = -25 °C: 346.344756 V
Voltage for Gain 150: T = +20 °C: 389.4540211 V     T = -25 °C: 353.7070512 V
Voltage for Gain 200: T = +20 °C: 393.8113583 V     T = -25 °C: 357.8136728 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.47706195 V-1     T = -25 °C: 4.851965989 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.7333899 V-1     T = -25 °C: 9.01288816 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.30665021 V-1     T = -25 °C: 16.12365851 V-1
Break-through voltage: T = +20 °C: 409.2686266 V     T = -25 °C: 372.8076782 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:48:05 CET jreher Updated box and position via API.
03. Feb 2021 18:14:26 CET jreher Updated box and position via API.
11. Aug 2020 17:20:26 CEST jreher Updated APD characteristics via API.
03. Apr 2020 09:59:52 CEST jreher Assigned to capsule by script
19. Feb 2020 11:53:33 CET jreher Updated box and position via API.
27. Nov 2019 19:30:04 CET jreher Updated APD location via API.
25. Nov 2019 17:11:13 CET jreher Updated box and position via API.
04. Jul 2019 11:05:22 CEST jreher Updated APD location via API.
04. Jul 2019 10:44:23 CEST jreher Updated APD location via API.
12. Jun 2019 16:45:43 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:30:38 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 15:00:01 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:12:39 CET Tobias Corrected dark current unit.
26. Sep 2018 11:19:43 CEST markus.moritz
12. Jan 2018 13:16:44 CET Tobias Imported from Hamamatsu datasheet.