RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2320025840 - Archived data from Wed, 03. February 2021 18:14:24 CET


This is all the information about APD 2320025840. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2320025840
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2320025840/2411026746
Unit: #1626 (barcode 1309014569)
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: B10
Break-through voltage: 413 V
Voltage for Gain 100 (T=+25°C): 384.3 V
Dark current: 6.1 nA
   
Screening Logistics:  
Available: No
Storage Box: 4
Position in Box: 26
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 21. Sep 2018
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 385.5065239 V     T = -25 °C: 349.7577283 V
Voltage for Gain 150: T = +20 °C: 393.4201276 V     T = -25 °C: 357.2571588 V
Voltage for Gain 200: T = +20 °C: 397.7293792 V     T = -25 °C: 361.4475043 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.678679616 V-1     T = -25 °C: 4.835816184 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.758275296 V-1     T = -25 °C: 8.463535421 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.18273724 V-1     T = -25 °C: 15.69367539 V-1
Break-through voltage: T = +20 °C: 411.6428294 V     T = -25 °C: 375.6198233 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:48:04 CET jreher Updated box and position via API.
03. Feb 2021 18:14:24 CET jreher Updated box and position via API.
25. Jan 2021 14:45:01 CET jreher Assigned to capsule by script
17. Aug 2020 15:51:00 CEST jreher Updated box and position via API.
11. Aug 2020 17:20:24 CEST jreher Updated APD characteristics via API.
20. Feb 2020 13:35:22 CET jreher Updated box and position via API.
27. Nov 2019 19:30:04 CET jreher Updated APD location via API.
25. Nov 2019 17:11:13 CET jreher Updated box and position via API.
04. Jul 2019 11:05:21 CEST jreher Updated APD location via API.
04. Jul 2019 10:44:23 CEST jreher Updated APD location via API.
12. Jun 2019 16:45:41 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:30:37 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 14:59:14 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:12:39 CET Tobias Corrected dark current unit.
26. Sep 2018 11:14:05 CEST markus.moritz
12. Jan 2018 13:16:44 CET Tobias Imported from Hamamatsu datasheet.