RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2320025836 - Archived data from Wed, 03. February 2021 18:14:24 CET


This is all the information about APD 2320025836. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2320025836
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F03
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 379.8 V
Dark current: 4.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 4
Position in Box: 23
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 21. Sep 2018
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 379.6397743 V     T = -25 °C: 344.4058656 V
Voltage for Gain 150: T = +20 °C: 387.5304098 V     T = -25 °C: 351.8130583 V
Voltage for Gain 200: T = +20 °C: 391.9498037 V     T = -25 °C: 355.9589944 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.547207984 V-1     T = -25 °C: 4.40295644 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.933114061 V-1     T = -25 °C: 9.538709524 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.83245142 V-1     T = -25 °C: 15.54502465 V-1
Break-through voltage: T = +20 °C: 407.9880263 V     T = -25 °C: 371.8277955 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:48:04 CET jreher Updated box and position via API.
03. Feb 2021 18:14:24 CET jreher Updated box and position via API.
11. Aug 2020 17:20:24 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:30:03 CET jreher Updated APD location via API.
25. Nov 2019 17:11:12 CET jreher Updated box and position via API.
04. Jul 2019 11:05:21 CEST jreher Updated APD location via API.
04. Jul 2019 10:44:22 CEST jreher Updated APD location via API.
12. Jun 2019 16:45:41 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:30:36 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 14:59:14 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:12:39 CET Tobias Corrected dark current unit.
26. Sep 2018 11:15:45 CEST markus.moritz
12. Jan 2018 13:16:44 CET Tobias Imported from Hamamatsu datasheet.