RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2320025826 - Archived data from Wed, 03. February 2021 18:14:23 CET


This is all the information about APD 2320025826. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2320025826
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: At GSI for QE measurement
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D02
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 380.9 V
Dark current: 4.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 4
Position in Box: 13
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 21. Sep 2018
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.8308541 V     T = -25 °C: 345.2847797 V
Voltage for Gain 150: T = +20 °C: 388.7428494 V     T = -25 °C: 352.72832 V
Voltage for Gain 200: T = +20 °C: 393.1711527 V     T = -25 °C: 356.917199 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.567837063 V-1     T = -25 °C: 4.612163644 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.190534666 V-1     T = -25 °C: 9.106381989 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.42513119 V-1     T = -25 °C: 14.71697587 V-1
Break-through voltage: T = +20 °C: 409.2883669 V     T = -25 °C: 372.952229 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:48:03 CET jreher Updated box and position via API.
03. Feb 2021 18:14:23 CET jreher Updated box and position via API.
11. Aug 2020 17:20:22 CEST jreher Updated APD characteristics via API.
28. Nov 2019 10:39:10 CET jreher Updated APD location via API.
25. Nov 2019 17:11:11 CET jreher Updated box and position via API.
13. Jun 2019 14:19:15 CEST jreher Updated APD location via API.
12. Jun 2019 16:45:40 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:30:36 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 14:59:13 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:12:38 CET Tobias Corrected dark current unit.
26. Sep 2018 11:09:48 CEST markus.moritz
12. Jan 2018 13:16:43 CET Tobias Imported from Hamamatsu datasheet.