RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2519029030 - Archived data from Tue, 11. August 2020 17:33:37 CEST


This is all the information about APD 2519029030. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2519029030
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C15
Break-through voltage: 407 V
Voltage for Gain 100 (T=+25°C): 380.3 V
Dark current: 3.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 67
Position in Box: 47
EP1 batch: 47
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.0549007 V     T = -25 °C: 344.7032914 V
Voltage for Gain 150: T = +20 °C: 387.8482096 V     T = -25 °C: 352.0425578 V
Voltage for Gain 200: T = +20 °C: 392.1685759 V     T = -25 °C: 356.1754168 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.625332558 V-1     T = -25 °C: 4.677426054 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.207607337 V-1     T = -25 °C: 9.518990924 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.49335867 V-1     T = -25 °C: 15.0555691 V-1
Break-through voltage: T = +20 °C: 405.4050634 V     T = -25 °C: 369.7423772 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:57:02 CET jreher Updated box and position via API.
03. Feb 2021 18:22:35 CET jreher Updated box and position via API.
11. Aug 2020 17:33:37 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:40:40 CET jreher Updated APD location via API.
25. Nov 2019 17:16:14 CET jreher Updated box and position via API.
05. Aug 2019 16:54:49 CEST jreher Updated APD batch assignment via API.
29. Jul 2019 13:44:35 CEST markus.moritz
29. Jul 2019 13:44:27 CEST markus.moritz
05. Jul 2019 13:45:14 CEST jreher Updated APD location via API.
01. Jul 2019 12:45:59 CEST jgrochowski Updated APD batch assignment via API.
03. Jan 2019 00:12:38 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:16 CET Tobias Imported from Hamamatsu datasheet.