RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2519029024 - Archived data from Tue, 11. August 2020 17:33:36 CEST


This is all the information about APD 2519029024. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2519029024
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E13
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 381.4 V
Dark current: 4.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 67
Position in Box: 42
EP1 batch: 47
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.655496 V     T = -25 °C: 345.9967079 V
Voltage for Gain 150: T = +20 °C: 389.4104197 V     T = -25 °C: 353.3607583 V
Voltage for Gain 200: T = +20 °C: 393.7196172 V     T = -25 °C: 357.5072738 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.460346296 V-1     T = -25 °C: 4.954244088 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.722494214 V-1     T = -25 °C: 9.133911773 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.21599452 V-1     T = -25 °C: 16.32439841 V-1
Break-through voltage: T = +20 °C: 409.0406538 V     T = -25 °C: 372.738074 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:57:01 CET jreher Updated box and position via API.
03. Feb 2021 18:22:34 CET jreher Updated box and position via API.
07. Oct 2020 12:16:40 CEST jreher Assigned to capsule by script
17. Aug 2020 15:50:15 CEST jreher Updated box and position via API.
11. Aug 2020 17:33:36 CEST jreher Updated APD characteristics via API.
20. Feb 2020 13:32:26 CET jreher Updated box and position via API.
27. Nov 2019 19:40:40 CET jreher Updated APD location via API.
25. Nov 2019 17:16:14 CET jreher Updated box and position via API.
05. Aug 2019 16:54:49 CEST jreher Updated APD batch assignment via API.
29. Jul 2019 13:31:16 CEST markus.moritz
05. Jul 2019 13:45:14 CEST jreher Updated APD location via API.
01. Jul 2019 12:45:59 CEST jgrochowski Updated APD batch assignment via API.
03. Jan 2019 00:12:38 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:16 CET Tobias Imported from Hamamatsu datasheet.