RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2519028994 - Archived data from Mon, 25. January 2021 14:44:56 CET


This is all the information about APD 2519028994. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2519028994
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2406026333/2519028994
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: D03
Break-through voltage: 407 V
Voltage for Gain 100 (T=+25°C): 379.3 V
Dark current: 4.6 nA
   
Screening Logistics:  
Available: No
Storage Box: 67
Position in Box: 13
EP1 batch: 46
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 379.4014585 V     T = -25 °C: 344.1015126 V
Voltage for Gain 150: T = +20 °C: 387.2156301 V     T = -25 °C: 351.4583311 V
Voltage for Gain 200: T = +20 °C: 391.581795 V     T = -25 °C: 355.5809531 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.495788965 V-1     T = -25 °C: 4.919450684 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.814927805 V-1     T = -25 °C: 9.111742542 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.40466531 V-1     T = -25 °C: 16.32430648 V-1
Break-through voltage: T = +20 °C: 407.7601682 V     T = -25 °C: 370.2055279 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:56:57 CET jreher Updated box and position via API.
03. Feb 2021 18:22:31 CET jreher Updated box and position via API.
25. Jan 2021 14:44:56 CET jreher Assigned to capsule by script
17. Aug 2020 15:50:58 CEST jreher Updated box and position via API.
11. Aug 2020 17:33:30 CEST jreher Updated APD characteristics via API.
20. Feb 2020 13:35:19 CET jreher Updated box and position via API.
27. Nov 2019 19:40:37 CET jreher Updated APD location via API.
25. Nov 2019 17:16:11 CET jreher Updated box and position via API.
05. Aug 2019 16:54:41 CEST jreher Updated APD batch assignment via API.
29. Jul 2019 12:00:28 CEST markus.moritz
05. Jul 2019 13:45:12 CEST jreher Updated APD location via API.
01. Jul 2019 12:50:03 CEST jgrochowski Updated APD batch assignment via API.
03. Jan 2019 00:12:37 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:15 CET Tobias Imported from Hamamatsu datasheet.