RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2519028989 - Archived data from Fri, 05. February 2021 10:56:57 CET


This is all the information about APD 2519028989. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2519028989
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C02
Break-through voltage: 407 V
Voltage for Gain 100 (T=+25°C): 380 V
Dark current: 4.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 67
Position in Box: 8
EP1 batch: 46
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 379.0182769 V     T = -25 °C: 344.2236394 V
Voltage for Gain 150: T = +20 °C: 386.8919356 V     T = -25 °C: 351.6102511 V
Voltage for Gain 200: T = +20 °C: 391.3040892 V     T = -25 °C: 355.7433442 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.584284404 V-1     T = -25 °C: 4.848814287 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.97651012 V-1     T = -25 °C: 9.861875136 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.81709842 V-1     T = -25 °C: 15.65694388 V-1
Break-through voltage: T = +20 °C: 406.5326783 V     T = -25 °C: 370.3979696 V
   
Notes:


Version history

Time Author Change comment
17. Jun 2021 19:46:17 CEST oafedulidis Assigned to capsule by script
15. Apr 2021 17:01:04 CEST jreher Updated box and position via API.
05. Feb 2021 10:56:57 CET jreher Updated box and position via API.
03. Feb 2021 18:22:30 CET jreher Updated box and position via API.
11. Aug 2020 17:33:30 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:40:37 CET jreher Updated APD location via API.
25. Nov 2019 17:16:11 CET jreher Updated box and position via API.
05. Aug 2019 16:54:34 CEST jreher Updated APD batch assignment via API.
05. Aug 2019 16:50:30 CEST jreher Updated APD batch assignment via API.
29. Jul 2019 11:58:29 CEST markus.moritz
05. Jul 2019 13:45:11 CEST jreher Updated APD location via API.
01. Jul 2019 12:50:03 CEST jgrochowski Updated APD batch assignment via API.
03. Jan 2019 00:12:37 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:15 CET Tobias Imported from Hamamatsu datasheet.