This is all the information about APD 2519028988. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2519028988
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C09
Break-through voltage: 406 V
Voltage for Gain 100 (T=+25°C): 377.8 V
Dark current: 4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 67
Position in Box: 7
EP1 batch: 46
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 378.3061023 V     T = -25 °C: 343.3499791 V
Voltage for Gain 150: T = +20 °C: 386.0874609 V     T = -25 °C: 350.6597557 V
Voltage for Gain 200: T = +20 °C: 390.43466 V     T = -25 °C: 354.7390106 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.534600963 V-1     T = -25 °C: 4.799412242 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.831683649 V-1     T = -25 °C: 9.848396631 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.41074712 V-1     T = -25 °C: 15.7452343 V-1
Break-through voltage: T = +20 °C: 405.105809 V     T = -25 °C: 368.8175477 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:56:56 CET jreher Updated box and position via API.
03. Feb 2021 18:22:30 CET jreher Updated box and position via API.
11. Aug 2020 17:33:29 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:40:37 CET jreher Updated APD location via API.
25. Nov 2019 17:16:11 CET jreher Updated box and position via API.
05. Aug 2019 16:54:33 CEST jreher Updated APD batch assignment via API.
05. Aug 2019 16:50:30 CEST jreher Updated APD batch assignment via API.
29. Jul 2019 11:58:05 CEST markus.moritz
05. Jul 2019 13:45:11 CEST jreher Updated APD location via API.
01. Jul 2019 12:50:03 CEST jgrochowski Updated APD batch assignment via API.
03. Jan 2019 00:12:37 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:15 CET Tobias Imported from Hamamatsu datasheet.