RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2519028981 - Archived data from Wed, 27. November 2019 19:40:29 CET


This is all the information about APD 2519028981. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2519028981
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G11
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 380.6 V
Dark current: 3.5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 66
Position in Box: 50
EP1 batch: 45
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 150: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 200: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 100: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 150: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 200: T = +20 °C: none     T = -25 °C: none
Break-through voltage: T = +20 °C: none     T = -25 °C: none
   
Notes:


Version history

Time Author Change comment
15. Feb 2021 15:38:53 CET jreher Assigned to capsule by script
05. Feb 2021 10:56:54 CET jreher Updated box and position via API.
03. Feb 2021 18:22:27 CET jreher Updated box and position via API.
18. Dec 2020 14:00:07 CET jreher Updated box and position via API.
11. Aug 2020 17:33:28 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:40:29 CET jreher Updated APD location via API.
25. Nov 2019 17:16:09 CET jreher Updated box and position via API.
05. Aug 2019 16:54:33 CEST jreher Updated APD batch assignment via API.
05. Aug 2019 16:50:30 CEST jreher Updated APD batch assignment via API.
29. Jul 2019 12:30:47 CEST jreher Updated APD batch assignment via API.
29. Jul 2019 11:54:06 CEST markus.moritz
05. Jul 2019 13:45:06 CEST jreher Updated APD location via API.
01. Jul 2019 12:56:00 CEST jgrochowski Updated APD batch assignment via API.
03. Jan 2019 00:12:36 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:15 CET Tobias Imported from Hamamatsu datasheet.