RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2519028980 - Archived data from Mon, 17. August 2020 15:54:05 CEST


This is all the information about APD 2519028980. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2519028980
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B11
Break-through voltage: 411 V
Voltage for Gain 100 (T=+25°C): 383.1 V
Dark current: 3.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 66
Position in Box: 49
EP1 batch: 45
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 383.644695 V     T = -25 °C: 347.9397725 V
Voltage for Gain 150: T = +20 °C: 391.4830892 V     T = -25 °C: 355.3589951 V
Voltage for Gain 200: T = +20 °C: 395.820711 V     T = -25 °C: 359.528295 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.420841065 V-1     T = -25 °C: 4.91166164 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.594470872 V-1     T = -25 °C: 9.135100337 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.01641055 V-1     T = -25 °C: 16.23162214 V-1
Break-through voltage: T = +20 °C: 410.1655953 V     T = -25 °C: 373.6378959 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:56:53 CET jreher Updated box and position via API.
03. Feb 2021 18:22:27 CET jreher Updated box and position via API.
07. Oct 2020 12:19:07 CEST jreher Assigned to capsule by script
17. Aug 2020 15:54:05 CEST jreher Updated box and position via API.
11. Aug 2020 17:33:28 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:40:29 CET jreher Updated APD location via API.
25. Nov 2019 17:16:09 CET jreher Updated box and position via API.
05. Aug 2019 16:54:33 CEST jreher Updated APD batch assignment via API.
05. Aug 2019 16:50:30 CEST jreher Updated APD batch assignment via API.
29. Jul 2019 12:30:47 CEST jreher Updated APD batch assignment via API.
29. Jul 2019 11:52:58 CEST markus.moritz
05. Jul 2019 13:45:06 CEST jreher Updated APD location via API.
01. Jul 2019 12:56:00 CEST jgrochowski Updated APD batch assignment via API.
03. Jan 2019 00:12:36 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:15 CET Tobias Imported from Hamamatsu datasheet.