Show Hamamatsu Avalanche Photo Diode 2518028964 - Archived data from Mon, 25. November 2019 17:16:08 CET
This is all the information about APD 2518028964. If it is wrong, edit the data.
Subdetector specification: | |
---|---|
Serial: | 2518028964 |
Type: | Hamamatsu Avalanche Photo Diode |
Detector: | unassigned |
Unit: | unassigned |
Preamp: | 0 |
Current location: | Bochum Box 66 |
Installation information: | |
Label: | none |
Manufacturer information: | |
Wafer position: | C09 |
Break-through voltage: | 407 V |
Voltage for Gain 100 (T=+25°C): | 378.2 V |
Dark current: | 5.4 nA |
Screening Logistics: | |
Available: | Yes |
Storage Box: | 61 |
Position in Box: | 41 |
EP1 batch: | 45 |
EP1 batch after irradiation: | none |
Shipment: | |
Grid number: | none |
Position in grid: | none |
Arrival for irradiation: | 16. Jul 2019 |
Sent for analysis after irradiation: | 19. Jul 2019 |
Return for assembly: | none |
Irradiation: | |
Date: | 16. Jul 2019 |
Dose used: | 37 Gy |
Temperature: | 20 °C |
Position: | none |
Bias voltage: | none |
Annealing: | |
Date: | 17. Jul 2019 |
Temperature: | 80 °C |
Duration: | 48 h |
Measurement results: | |
Voltage for Gain 100: | T = +20 °C: none T = -25 °C: none |
Voltage for Gain 150: | T = +20 °C: none T = -25 °C: none |
Voltage for Gain 200: | T = +20 °C: none T = -25 °C: none |
Gain/Voltage slope at M = 100: | T = +20 °C: none T = -25 °C: none |
Gain/Voltage slope at M = 150: | T = +20 °C: none T = -25 °C: none |
Gain/Voltage slope at M = 200: | T = +20 °C: none T = -25 °C: none |
Break-through voltage: | T = +20 °C: none T = -25 °C: none |
Notes: |
Version history
Time | Author | Change comment |
---|---|---|
03. May 2021 10:25:42 CEST | oafedulidis | Updated box and position via API. |
05. Feb 2021 10:56:52 CET | jreher | Updated box and position via API. |
03. Feb 2021 18:22:26 CET | jreher | Updated box and position via API. |
11. Aug 2020 17:33:26 CEST | jreher | Updated APD characteristics via API. |
27. Nov 2019 19:40:28 CET | jreher | Updated APD location via API. |
25. Nov 2019 17:16:08 CET | jreher | Updated box and position via API. |
05. Aug 2019 16:54:32 CEST | jreher | Updated APD batch assignment via API. |
05. Aug 2019 16:50:29 CEST | jreher | Updated APD batch assignment via API. |
29. Jul 2019 12:30:46 CEST | jreher | Updated APD batch assignment via API. |
29. Jul 2019 11:35:48 CEST | markus.moritz | |
05. Jul 2019 13:45:05 CEST | jreher | Updated APD location via API. |
01. Jul 2019 12:55:59 CEST | jgrochowski | Updated APD batch assignment via API. |
03. Jan 2019 00:12:36 CET | Tobias | Corrected dark current unit. |
12. Jan 2018 13:12:15 CET | Tobias | Imported from Hamamatsu datasheet. |