RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2518028964 - Archived data from Wed, 03. February 2021 18:22:26 CET


This is all the information about APD 2518028964. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2518028964
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C09
Break-through voltage: 407 V
Voltage for Gain 100 (T=+25°C): 378.2 V
Dark current: 5.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 61
Position in Box: 41
EP1 batch: 45
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 377.9599042 V     T = -25 °C: 342.7544515 V
Voltage for Gain 150: T = +20 °C: 385.7581755 V     T = -25 °C: 350.097249 V
Voltage for Gain 200: T = +20 °C: 390.1140637 V     T = -25 °C: 354.2193037 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.660282113 V-1     T = -25 °C: 5.039651772 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.210906615 V-1     T = -25 °C: 9.40916776 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.31410166 V-1     T = -25 °C: 14.89340502 V-1
Break-through voltage: T = +20 °C: 406.0294642 V     T = -25 °C: 369.5378801 V
   
Notes:


Version history

Time Author Change comment
03. May 2021 10:25:42 CEST oafedulidis Updated box and position via API.
05. Feb 2021 10:56:52 CET jreher Updated box and position via API.
03. Feb 2021 18:22:26 CET jreher Updated box and position via API.
11. Aug 2020 17:33:26 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:40:28 CET jreher Updated APD location via API.
25. Nov 2019 17:16:08 CET jreher Updated box and position via API.
05. Aug 2019 16:54:32 CEST jreher Updated APD batch assignment via API.
05. Aug 2019 16:50:29 CEST jreher Updated APD batch assignment via API.
29. Jul 2019 12:30:46 CEST jreher Updated APD batch assignment via API.
29. Jul 2019 11:35:48 CEST markus.moritz
05. Jul 2019 13:45:05 CEST jreher Updated APD location via API.
01. Jul 2019 12:55:59 CEST jgrochowski Updated APD batch assignment via API.
03. Jan 2019 00:12:36 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:15 CET Tobias Imported from Hamamatsu datasheet.