RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2518028962 - Archived data from Tue, 11. August 2020 17:33:26 CEST


This is all the information about APD 2518028962. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2518028962
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E07
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 378.9 V
Dark current: 4.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 66
Position in Box: 34
EP1 batch: 45
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 378.8936508 V     T = -25 °C: 343.60882 V
Voltage for Gain 150: T = +20 °C: 386.7087456 V     T = -25 °C: 350.9554523 V
Voltage for Gain 200: T = +20 °C: 391.0606566 V     T = -25 °C: 355.0684159 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.694303977 V-1     T = -25 °C: 4.724118482 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.328232694 V-1     T = -25 °C: 9.645644557 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.49231404 V-1     T = -25 °C: 15.33013072 V-1
Break-through voltage: T = +20 °C: 406.7164935 V     T = -25 °C: 370.1640901 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:56:51 CET jreher Updated box and position via API.
03. Feb 2021 18:22:25 CET jreher Updated box and position via API.
07. Oct 2020 12:27:27 CEST jreher Assigned to capsule by script
17. Aug 2020 15:53:37 CEST jreher Updated box and position via API.
11. Aug 2020 17:33:26 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:40:28 CET jreher Updated APD location via API.
25. Nov 2019 17:16:08 CET jreher Updated box and position via API.
05. Aug 2019 16:54:32 CEST jreher Updated APD batch assignment via API.
05. Aug 2019 16:50:28 CEST jreher Updated APD batch assignment via API.
29. Jul 2019 12:30:46 CEST jreher Updated APD batch assignment via API.
29. Jul 2019 11:35:02 CEST markus.moritz
05. Jul 2019 13:45:05 CEST jreher Updated APD location via API.
01. Jul 2019 12:55:59 CEST jgrochowski Updated APD batch assignment via API.
03. Jan 2019 00:12:36 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:15 CET Tobias Imported from Hamamatsu datasheet.