RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2518028943 - Archived data from Tue, 11. August 2020 17:33:22 CEST


This is all the information about APD 2518028943. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2518028943
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E06
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 380 V
Dark current: 5.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 66
Position in Box: 15
EP1 batch: 44
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 379.9653412 V     T = -25 °C: 344.5933517 V
Voltage for Gain 150: T = +20 °C: 387.8025961 V     T = -25 °C: 351.9426447 V
Voltage for Gain 200: T = +20 °C: 392.165681 V     T = -25 °C: 356.0766375 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.588489684 V-1     T = -25 °C: 4.724375241 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.082118915 V-1     T = -25 °C: 9.443918479 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.124443 V-1     T = -25 °C: 15.04312253 V-1
Break-through voltage: T = +20 °C: 407.1802027 V     T = -25 °C: 371.0349488 V
   
Notes:


Version history

Time Author Change comment
29. Apr 2021 17:05:44 CEST oafedulidis Assigned to capsule by script
16. Feb 2021 12:28:34 CET jreher Updated box and position via API.
05. Feb 2021 10:56:49 CET jreher Updated box and position via API.
03. Feb 2021 18:22:23 CET jreher Updated box and position via API.
11. Aug 2020 17:33:22 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:40:26 CET jreher Updated APD location via API.
25. Nov 2019 17:16:06 CET jreher Updated box and position via API.
05. Aug 2019 16:50:14 CEST jreher Updated APD batch assignment via API.
05. Aug 2019 16:50:03 CEST jreher Updated APD batch assignment via API.
29. Jul 2019 11:21:24 CEST markus.moritz
05. Jul 2019 13:45:04 CEST jreher Updated APD location via API.
01. Jul 2019 12:59:50 CEST jgrochowski Updated APD batch assignment via API.
03. Jan 2019 00:12:35 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:14 CET Tobias Imported from Hamamatsu datasheet.