RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2518028942 - Archived data from Wed, 03. February 2021 18:22:23 CET


This is all the information about APD 2518028942. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2518028942
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D06
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 381 V
Dark current: 5.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 61
Position in Box: 36
EP1 batch: 44
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.9880059 V     T = -25 °C: 346.2138373 V
Voltage for Gain 150: T = +20 °C: 388.8238579 V     T = -25 °C: 353.4460646 V
Voltage for Gain 200: T = +20 °C: 393.1934373 V     T = -25 °C: 357.4811356 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.622771118 V-1     T = -25 °C: 4.948159681 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.066130157 V-1     T = -25 °C: 9.249314383 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.09362229 V-1     T = -25 °C: 16.71716965 V-1
Break-through voltage: T = +20 °C: 408.6020142 V     T = -25 °C: 372.2141758 V
   
Notes:


Version history

Time Author Change comment
03. May 2021 10:25:42 CEST oafedulidis Updated box and position via API.
05. Feb 2021 10:56:49 CET jreher Updated box and position via API.
03. Feb 2021 18:22:23 CET jreher Updated box and position via API.
11. Aug 2020 17:33:22 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:40:26 CET jreher Updated APD location via API.
25. Nov 2019 17:16:06 CET jreher Updated box and position via API.
05. Aug 2019 16:50:14 CEST jreher Updated APD batch assignment via API.
05. Aug 2019 16:50:03 CEST jreher Updated APD batch assignment via API.
29. Jul 2019 11:18:40 CEST markus.moritz
05. Jul 2019 13:45:03 CEST jreher Updated APD location via API.
01. Jul 2019 12:59:50 CEST jgrochowski Updated APD batch assignment via API.
03. Jan 2019 00:12:35 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:14 CET Tobias Imported from Hamamatsu datasheet.