RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2518028930 - Archived data from Wed, 03. February 2021 18:22:22 CET


This is all the information about APD 2518028930. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2518028930
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E14
Break-through voltage: 405 V
Voltage for Gain 100 (T=+25°C): 376.7 V
Dark current: 5.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 61
Position in Box: 30
EP1 batch: 44
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 16. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 376.9067965 V     T = -25 °C: 341.9179909 V
Voltage for Gain 150: T = +20 °C: 384.7218108 V     T = -25 °C: 349.2099539 V
Voltage for Gain 200: T = +20 °C: 389.0911084 V     T = -25 °C: 353.3168256 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.689998356 V-1     T = -25 °C: 5.007539549 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.201393048 V-1     T = -25 °C: 9.281428961 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.34292019 V-1     T = -25 °C: 14.8161336 V-1
Break-through voltage: T = +20 °C: 405.7735102 V     T = -25 °C: 368.4714216 V
   
Notes:


Version history

Time Author Change comment
16. Nov 2021 09:32:01 CET oafedulidis Assigned to capsule by script
17. May 2021 09:15:17 CEST oafedulidis Updated box and position via API.
03. May 2021 10:25:41 CEST oafedulidis Updated box and position via API.
05. Feb 2021 10:56:47 CET jreher Updated box and position via API.
03. Feb 2021 18:22:22 CET jreher Updated box and position via API.
11. Aug 2020 17:33:19 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:40:25 CET jreher Updated APD location via API.
25. Nov 2019 17:16:05 CET jreher Updated box and position via API.
05. Aug 2019 16:50:13 CEST jreher Updated APD batch assignment via API.
05. Aug 2019 16:50:02 CEST jreher Updated APD batch assignment via API.
29. Jul 2019 11:08:05 CEST markus.moritz
05. Jul 2019 13:45:02 CEST jreher Updated APD location via API.
01. Jul 2019 12:59:49 CEST jgrochowski Updated APD batch assignment via API.
03. Jan 2019 00:12:35 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:14 CET Tobias Imported from Hamamatsu datasheet.