RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2518028926 - Archived data from Wed, 03. February 2021 18:22:19 CET


This is all the information about APD 2518028926. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2518028926
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2518028926/0801007279
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: E15
Break-through voltage: 405 V
Voltage for Gain 100 (T=+25°C): 376.3 V
Dark current: 5.1 nA
   
Screening Logistics:  
Available: No
Storage Box: 65
Position in Box: 48
EP1 batch: 44
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 16. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 376.3441002 V     T = -25 °C: 341.4011402 V
Voltage for Gain 150: T = +20 °C: 384.1764375 V     T = -25 °C: 348.7198593 V
Voltage for Gain 200: T = +20 °C: 388.5717363 V     T = -25 °C: 352.8396463 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.508534414 V-1     T = -25 °C: 4.813582478 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.759820637 V-1     T = -25 °C: 9.719460609 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.19278695 V-1     T = -25 °C: 15.69258826 V-1
Break-through voltage: T = +20 °C: 403.7498508 V     T = -25 °C: 367.7708875 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:56:45 CET jreher Updated box and position via API.
03. Feb 2021 18:22:19 CET jreher Updated box and position via API.
11. Aug 2020 17:33:18 CEST jreher Updated APD characteristics via API.
03. Apr 2020 09:59:33 CEST jreher Assigned to capsule by script
19. Feb 2020 11:53:20 CET jreher Updated box and position via API.
27. Nov 2019 19:40:18 CET jreher Updated APD location via API.
25. Nov 2019 17:16:04 CET jreher Updated box and position via API.
05. Aug 2019 16:50:13 CEST jreher Updated APD batch assignment via API.
05. Aug 2019 16:50:02 CEST jreher Updated APD batch assignment via API.
29. Jul 2019 10:42:02 CEST markus.moritz
05. Jul 2019 13:44:58 CEST jreher Updated APD location via API.
01. Jul 2019 12:59:49 CEST jgrochowski Updated APD batch assignment via API.
03. Jan 2019 00:12:35 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:14 CET Tobias Imported from Hamamatsu datasheet.