RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2518028922 - Archived data from Wed, 03. February 2021 18:22:19 CET


This is all the information about APD 2518028922. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2518028922
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C03
Break-through voltage: 414 V
Voltage for Gain 100 (T=+25°C): 386.6 V
Dark current: 7.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 65
Position in Box: 44
EP1 batch: 44
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 385.9243817 V     T = -25 °C: 350.0883112 V
Voltage for Gain 150: T = +20 °C: 393.7628014 V     T = -25 °C: 357.6043548 V
Voltage for Gain 200: T = +20 °C: 398.110412 V     T = -25 °C: 361.8045721 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.620719617 V-1     T = -25 °C: 4.810081664 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.250066923 V-1     T = -25 °C: 9.717690183 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.41765012 V-1     T = -25 °C: 15.41381285 V-1
Break-through voltage: T = +20 °C: 413.0913839 V     T = -25 °C: 376.9363552 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:56:45 CET jreher Updated box and position via API.
03. Feb 2021 18:22:19 CET jreher Updated box and position via API.
11. Aug 2020 17:33:18 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:40:17 CET jreher Updated APD location via API.
25. Nov 2019 17:16:04 CET jreher Updated box and position via API.
05. Aug 2019 16:49:40 CEST jreher Updated APD batch assignment via API.
25. Jul 2019 15:37:21 CEST markus.moritz
05. Jul 2019 13:44:58 CEST jreher Updated APD location via API.
01. Jul 2019 12:59:48 CEST jgrochowski Updated APD batch assignment via API.
03. Jan 2019 00:12:35 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:14 CET Tobias Imported from Hamamatsu datasheet.