RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2518028919 - Archived data from Wed, 03. February 2021 18:22:19 CET


This is all the information about APD 2518028919. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2518028919
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2518028919/0803007396
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: F11
Break-through voltage: 407 V
Voltage for Gain 100 (T=+25°C): 378.9 V
Dark current: 4.4 nA
   
Screening Logistics:  
Available: No
Storage Box: 65
Position in Box: 41
EP1 batch: 44
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 378.923392 V     T = -25 °C: 343.6787784 V
Voltage for Gain 150: T = +20 °C: 386.7101478 V     T = -25 °C: 351.0086564 V
Voltage for Gain 200: T = +20 °C: 391.0395729 V     T = -25 °C: 355.122312 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.692584496 V-1     T = -25 °C: 4.690099578 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.31774363 V-1     T = -25 °C: 9.577614075 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.53937173 V-1     T = -25 °C: 15.05418757 V-1
Break-through voltage: T = +20 °C: 406.8782709 V     T = -25 °C: 370.5818232 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:56:44 CET jreher Updated box and position via API.
03. Feb 2021 18:22:19 CET jreher Updated box and position via API.
11. Aug 2020 17:33:17 CEST jreher Updated APD characteristics via API.
03. Apr 2020 10:06:40 CEST jreher Assigned to capsule by script
20. Feb 2020 13:34:29 CET jreher Updated box and position via API.
27. Nov 2019 19:40:17 CET jreher Updated APD location via API.
25. Nov 2019 17:16:03 CET jreher Updated box and position via API.
05. Aug 2019 16:49:40 CEST jreher Updated APD batch assignment via API.
25. Jul 2019 15:35:16 CEST markus.moritz
05. Jul 2019 13:44:57 CEST jreher Updated APD location via API.
01. Jul 2019 12:59:48 CEST jgrochowski Updated APD batch assignment via API.
03. Jan 2019 00:12:34 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:14 CET Tobias Imported from Hamamatsu datasheet.