RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2518028917


This is all the information about APD 2518028917. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2518028917
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 1403015285/2518028917
Unit: #2620 (barcode 1309029549)
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: D02
Break-through voltage: 418 V
Voltage for Gain 100 (T=+25°C): 389.7 V
Dark current: 6.6 nA
   
Screening Logistics:  
Available: No
Storage Box: 65
Position in Box: 39
EP1 batch: 43
EP1 batch after irradiation: 10133
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 389.3274092 V     T = -25 °C: 353.1388504 V
Voltage for Gain 150: T = +20 °C: 397.1783949 V     T = -25 °C: 360.6842627 V
Voltage for Gain 200: T = +20 °C: 401.5352052 V     T = -25 °C: 364.9037732 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.466964555 V-1     T = -25 °C: 4.769677791 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.731754447 V-1     T = -25 °C: 9.516020112 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.23853859 V-1     T = -25 °C: 14.93274967 V-1
Break-through voltage: T = +20 °C: 416.8592207 V     T = -25 °C: 380.3035981 V
   
Notes:


Characteristics

Temperature Measurement Notes
No characteristics available!


Upload new characteristic...

Progression of the current during irradiation

Upload time Notes
No data available!


Upload new progression data...

Version history

Time Author Change comment
26. Oct 2021 10:45:53 CEST oafedulidis Assigned to capsule by script
17. May 2021 09:15:49 CEST oafedulidis Updated box and position via API.
05. Feb 2021 10:56:44 CET jreher Updated box and position via API.
03. Feb 2021 18:22:18 CET jreher Updated box and position via API.
11. Aug 2020 17:33:17 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:40:17 CET jreher Updated APD location via API.
25. Nov 2019 17:16:03 CET jreher Updated box and position via API.
05. Aug 2019 16:49:40 CEST jreher Updated APD batch assignment via API.
25. Jul 2019 15:32:56 CEST markus.moritz
05. Jul 2019 13:44:57 CEST jreher Updated APD location via API.
01. Jul 2019 13:08:20 CEST jgrochowski Updated APD batch assignment via API.
03. Jan 2019 00:12:34 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:14 CET Tobias Imported from Hamamatsu datasheet.