RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2517028895 - Archived data from Wed, 03. February 2021 18:22:17 CET


This is all the information about APD 2517028895. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2517028895
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F04
Break-through voltage: 405 V
Voltage for Gain 100 (T=+25°C): 376.2 V
Dark current: 4.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 65
Position in Box: 26
EP1 batch: 43
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 376.2165036 V     T = -25 °C: 341.3010996 V
Voltage for Gain 150: T = +20 °C: 383.97794 V     T = -25 °C: 348.6242102 V
Voltage for Gain 200: T = +20 °C: 388.3357049 V     T = -25 °C: 352.7198654 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.581815229 V-1     T = -25 °C: 4.844834502 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.985340584 V-1     T = -25 °C: 9.908771853 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.88226101 V-1     T = -25 °C: 15.76282889 V-1
Break-through voltage: T = +20 °C: 404.1705099 V     T = -25 °C: 368.1196298 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:56:43 CET jreher Updated box and position via API.
03. Feb 2021 18:22:17 CET jreher Updated box and position via API.
11. Aug 2020 17:33:15 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:40:16 CET jreher Updated APD location via API.
25. Nov 2019 17:16:02 CET jreher Updated box and position via API.
05. Aug 2019 16:49:39 CEST jreher Updated APD batch assignment via API.
25. Jul 2019 15:22:36 CEST markus.moritz
05. Jul 2019 13:44:56 CEST jreher Updated APD location via API.
01. Jul 2019 13:08:19 CEST jgrochowski Updated APD batch assignment via API.
03. Jan 2019 00:12:34 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:14 CET Tobias Imported from Hamamatsu datasheet.