RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2517028892 - Archived data from Tue, 06. October 2020 16:53:08 CEST


This is all the information about APD 2517028892. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2517028892
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C13
Break-through voltage: 411 V
Voltage for Gain 100 (T=+25°C): 382.9 V
Dark current: 4.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 65
Position in Box: 23
EP1 batch: 43
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.9835566 V     T = -25 °C: 347.4022668 V
Voltage for Gain 150: T = +20 °C: 390.8088055 V     T = -25 °C: 354.8176909 V
Voltage for Gain 200: T = +20 °C: 395.1501077 V     T = -25 °C: 358.9786921 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.664326332 V-1     T = -25 °C: 4.738184889 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.236834927 V-1     T = -25 °C: 9.659279272 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.44485341 V-1     T = -25 °C: 15.38997516 V-1
Break-through voltage: T = +20 °C: 410.314236 V     T = -25 °C: 374.0654696 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:56:42 CET jreher Updated box and position via API.
03. Feb 2021 18:22:16 CET jreher Updated box and position via API.
08. Dec 2020 17:17:57 CET jreher Assigned to capsule by script
06. Oct 2020 16:53:08 CEST jreher Updated box and position via API.
11. Aug 2020 17:33:14 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:40:16 CET jreher Updated APD location via API.
25. Nov 2019 17:16:02 CET jreher Updated box and position via API.
05. Aug 2019 16:49:39 CEST jreher Updated APD batch assignment via API.
25. Jul 2019 15:21:00 CEST markus.moritz
05. Jul 2019 13:44:56 CEST jreher Updated APD location via API.
01. Jul 2019 13:08:19 CEST jgrochowski Updated APD batch assignment via API.
03. Jan 2019 00:12:34 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:13 CET Tobias Imported from Hamamatsu datasheet.