RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2517028884 - Archived data from Tue, 11. August 2020 17:33:12 CEST


This is all the information about APD 2517028884. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2517028884
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2517028884/2316025505
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: E02
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 380 V
Dark current: 4.5 nA
   
Screening Logistics:  
Available: No
Storage Box: 65
Position in Box: 15
EP1 batch: 43
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.2547656 V     T = -25 °C: 344.8618928 V
Voltage for Gain 150: T = +20 °C: 388.1026925 V     T = -25 °C: 352.2668334 V
Voltage for Gain 200: T = +20 °C: 392.4913524 V     T = -25 °C: 356.4362457 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.541037706 V-1     T = -25 °C: 4.955642821 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.86728665 V-1     T = -25 °C: 9.210418138 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.39603143 V-1     T = -25 °C: 16.36861889 V-1
Break-through voltage: T = +20 °C: 407.570134 V     T = -25 °C: 371.443657 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:56:41 CET jreher Updated box and position via API.
03. Feb 2021 18:22:15 CET jreher Updated box and position via API.
11. Aug 2020 17:33:12 CEST jreher Updated APD characteristics via API.
31. Mar 2020 08:51:51 CEST jreher Assigned to capsule by script
13. Feb 2020 14:19:55 CET jreher Updated box and position via API.
27. Nov 2019 19:40:15 CET jreher Updated APD location via API.
25. Nov 2019 17:16:01 CET jreher Updated box and position via API.
05. Aug 2019 16:49:38 CEST jreher Updated APD batch assignment via API.
25. Jul 2019 15:16:13 CEST markus.moritz
05. Jul 2019 13:44:55 CEST jreher Updated APD location via API.
01. Jul 2019 13:08:18 CEST jgrochowski Updated APD batch assignment via API.
03. Jan 2019 00:12:34 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:13 CET Tobias Imported from Hamamatsu datasheet.