RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2517028873 - Archived data from Tue, 11. August 2020 17:33:10 CEST


This is all the information about APD 2517028873. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2517028873
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: A08
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 381.4 V
Dark current: 3.5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 65
Position in Box: 5
EP1 batch: 42
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.2836612 V     T = -25 °C: 346.7143914 V
Voltage for Gain 150: T = +20 °C: 390.1507235 V     T = -25 °C: 354.1585419 V
Voltage for Gain 200: T = +20 °C: 394.5308736 V     T = -25 °C: 358.3467605 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.483368669 V-1     T = -25 °C: 4.964941461 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.756763766 V-1     T = -25 °C: 9.235607259 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.20042446 V-1     T = -25 °C: 14.43629651 V-1
Break-through voltage: T = +20 °C: 408.5660835 V     T = -25 °C: 372.3669552 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:56:40 CET jreher Updated box and position via API.
03. Feb 2021 18:22:14 CET jreher Updated box and position via API.
07. Oct 2020 15:50:48 CEST jreher Assigned to capsule by script
17. Aug 2020 15:51:09 CEST jreher Updated box and position via API.
11. Aug 2020 17:33:10 CEST jreher Updated APD characteristics via API.
20. Feb 2020 13:35:29 CET jreher Updated box and position via API.
27. Nov 2019 19:40:14 CET jreher Updated APD location via API.
25. Nov 2019 17:16:01 CET jreher Updated box and position via API.
05. Aug 2019 16:48:26 CEST jreher Updated APD batch assignment via API.
25. Jul 2019 12:24:41 CEST markus.moritz
05. Jul 2019 13:44:55 CEST jreher Updated APD location via API.
01. Jul 2019 14:31:12 CEST spankonin Updated APD batch assignment via API.
03. Jan 2019 00:12:33 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:13 CET Tobias Imported from Hamamatsu datasheet.