Show Hamamatsu Avalanche Photo Diode 2517028865 - Archived data from Mon, 25. November 2019 17:15:59 CET
This is all the information about APD 2517028865. If it is wrong, edit the data.
Subdetector specification: | |
---|---|
Serial: | 2517028865 |
Type: | Hamamatsu Avalanche Photo Diode |
Detector: | unassigned |
Unit: | unassigned |
Preamp: | 0 |
Current location: | Bochum Box 64 |
Installation information: | |
Label: | none |
Manufacturer information: | |
Wafer position: | H07 |
Break-through voltage: | 405 V |
Voltage for Gain 100 (T=+25°C): | 377 V |
Dark current: | 6.5 nA |
Screening Logistics: | |
Available: | Yes |
Storage Box: | 64 |
Position in Box: | 28 |
EP1 batch: | 42 |
EP1 batch after irradiation: | none |
Shipment: | |
Grid number: | none |
Position in grid: | none |
Arrival for irradiation: | 16. Jul 2019 |
Sent for analysis after irradiation: | 19. Jul 2019 |
Return for assembly: | none |
Irradiation: | |
Date: | 16. Jul 2019 |
Dose used: | 37 Gy |
Temperature: | 20 °C |
Position: | none |
Bias voltage: | none |
Annealing: | |
Date: | 17. Jul 2019 |
Temperature: | 80 °C |
Duration: | 48 h |
Measurement results: | |
Voltage for Gain 100: | T = +20 °C: none T = -25 °C: none |
Voltage for Gain 150: | T = +20 °C: none T = -25 °C: none |
Voltage for Gain 200: | T = +20 °C: none T = -25 °C: none |
Gain/Voltage slope at M = 100: | T = +20 °C: none T = -25 °C: none |
Gain/Voltage slope at M = 150: | T = +20 °C: none T = -25 °C: none |
Gain/Voltage slope at M = 200: | T = +20 °C: none T = -25 °C: none |
Break-through voltage: | T = +20 °C: none T = -25 °C: none |
Notes: |
Version history
Time | Author | Change comment |
---|---|---|
03. May 2021 10:25:06 CEST | oafedulidis | Updated box and position via API. |
05. Feb 2021 10:56:37 CET | jreher | Updated box and position via API. |
03. Feb 2021 18:22:11 CET | jreher | Updated box and position via API. |
11. Aug 2020 17:33:09 CEST | jreher | Updated APD characteristics via API. |
27. Nov 2019 19:40:06 CET | jreher | Updated APD location via API. |
25. Nov 2019 17:15:59 CET | jreher | Updated box and position via API. |
05. Aug 2019 16:48:25 CEST | jreher | Updated APD batch assignment via API. |
25. Jul 2019 12:21:59 CEST | markus.moritz | |
05. Jul 2019 13:44:50 CEST | jreher | Updated APD location via API. |
01. Jul 2019 14:31:11 CEST | spankonin | Updated APD batch assignment via API. |
03. Jan 2019 00:12:33 CET | Tobias | Corrected dark current unit. |
12. Jan 2018 13:12:13 CET | Tobias | Imported from Hamamatsu datasheet. |