RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2517028847 - Archived data from Fri, 05. February 2021 10:56:35 CET


This is all the information about APD 2517028847. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2517028847
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D04
Break-through voltage: 405 V
Voltage for Gain 100 (T=+25°C): 376.8 V
Dark current: 4.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 64
Position in Box: 13
EP1 batch: 42
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 376.6232607 V     T = -25 °C: 341.7459365 V
Voltage for Gain 150: T = +20 °C: 384.3998413 V     T = -25 °C: 349.0155072 V
Voltage for Gain 200: T = +20 °C: 388.7412683 V     T = -25 °C: 353.1106692 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.466631481 V-1     T = -25 °C: 5.106963347 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.668118515 V-1     T = -25 °C: 9.629048382 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.02678946 V-1     T = -25 °C: 15.11820519 V-1
Break-through voltage: T = +20 °C: 404.354173 V     T = -25 °C: 368.0790357 V
   
Notes:


Version history

Time Author Change comment
26. Oct 2021 15:17:16 CEST oafedulidis Assigned to capsule by script
10. May 2021 14:01:55 CEST oafedulidis Updated box and position via API.
03. May 2021 10:25:04 CEST oafedulidis Updated box and position via API.
05. Feb 2021 10:56:35 CET jreher Updated box and position via API.
03. Feb 2021 18:22:09 CET jreher Updated box and position via API.
11. Aug 2020 17:33:06 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:40:05 CET jreher Updated APD location via API.
25. Nov 2019 17:15:58 CET jreher Updated box and position via API.
01. Aug 2019 12:11:16 CEST spankonin Updated APD batch assignment via API.
25. Jul 2019 12:12:08 CEST markus.moritz
05. Jul 2019 13:44:48 CEST jreher Updated APD location via API.
01. Jul 2019 14:31:10 CEST spankonin Updated APD batch assignment via API.
03. Jan 2019 00:12:32 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:13 CET Tobias Imported from Hamamatsu datasheet.