RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2517028845 - Archived data from Fri, 29. January 2021 10:25:20 CET


This is all the information about APD 2517028845. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2517028845
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2405026266/2517028845
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: A06
Break-through voltage: 407 V
Voltage for Gain 100 (T=+25°C): 378.5 V
Dark current: 4.5 nA
   
Screening Logistics:  
Available: No
Storage Box: 64
Position in Box: 27
EP1 batch: 41
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 378.9687049 V     T = -25 °C: 343.8420348 V
Voltage for Gain 150: T = +20 °C: 386.8419672 V     T = -25 °C: 351.2411491 V
Voltage for Gain 200: T = +20 °C: 391.2477965 V     T = -25 °C: 355.4138609 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.594003769 V-1     T = -25 °C: 4.958250542 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.989747614 V-1     T = -25 °C: 9.120631899 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.80686987 V-1     T = -25 °C: 16.10693813 V-1
Break-through voltage: T = +20 °C: 406.0721004 V     T = -25 °C: 369.9201941 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:56:35 CET jreher Updated box and position via API.
03. Feb 2021 18:22:09 CET jreher Updated box and position via API.
29. Jan 2021 10:25:20 CET jreher Assigned to capsule by script
06. Oct 2020 16:50:46 CEST jreher Updated box and position via API.
11. Aug 2020 17:33:05 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:40:05 CET jreher Updated APD location via API.
25. Nov 2019 17:15:58 CET jreher Updated box and position via API.
01. Aug 2019 12:11:16 CEST spankonin Updated APD batch assignment via API.
25. Jul 2019 12:11:14 CEST markus.moritz
05. Jul 2019 13:44:48 CEST jreher Updated APD location via API.
01. Jul 2019 14:30:53 CEST spankonin Updated APD batch assignment via API.
03. Jan 2019 00:12:32 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:13 CET Tobias Imported from Hamamatsu datasheet.