RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2517028841 - Archived data from Wed, 03. February 2021 18:22:09 CET


This is all the information about APD 2517028841. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2517028841
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G13
Break-through voltage: 412 V
Voltage for Gain 100 (T=+25°C): 384.8 V
Dark current: 5.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 64
Position in Box: 8
EP1 batch: 41
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 384.0964296 V     T = -25 °C: 348.4945175 V
Voltage for Gain 150: T = +20 °C: 391.9782491 V     T = -25 °C: 355.9503037 V
Voltage for Gain 200: T = +20 °C: 396.3688665 V     T = -25 °C: 360.1297408 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.554500801 V-1     T = -25 °C: 4.698372459 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.925871071 V-1     T = -25 °C: 9.398454868 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.57103745 V-1     T = -25 °C: 14.78203871 V-1
Break-through voltage: T = +20 °C: 410.8743796 V     T = -25 °C: 374.9532854 V
   
Notes:


Version history

Time Author Change comment
03. May 2021 10:25:04 CEST oafedulidis Updated box and position via API.
05. Feb 2021 10:56:35 CET jreher Updated box and position via API.
03. Feb 2021 18:22:09 CET jreher Updated box and position via API.
11. Aug 2020 17:33:04 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:40:05 CET jreher Updated APD location via API.
25. Nov 2019 17:15:57 CET jreher Updated box and position via API.
01. Aug 2019 12:11:15 CEST spankonin Updated APD batch assignment via API.
25. Jul 2019 12:08:38 CEST markus.moritz
05. Jul 2019 13:44:48 CEST jreher Updated APD location via API.
01. Jul 2019 14:30:53 CEST spankonin Updated APD batch assignment via API.
03. Jan 2019 00:12:32 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:13 CET Tobias Imported from Hamamatsu datasheet.