RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2517028836 - Archived data from Wed, 03. February 2021 18:22:08 CET


This is all the information about APD 2517028836. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2517028836
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F02
Break-through voltage: 406 V
Voltage for Gain 100 (T=+25°C): 377.4 V
Dark current: 4.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 64
Position in Box: 5
EP1 batch: 41
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 377.7068856 V     T = -25 °C: 342.7716729 V
Voltage for Gain 150: T = +20 °C: 385.5378317 V     T = -25 °C: 350.1273486 V
Voltage for Gain 200: T = +20 °C: 389.9039968 V     T = -25 °C: 354.2850019 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.734413184 V-1     T = -25 °C: 5.030226996 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.361110848 V-1     T = -25 °C: 9.335265087 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.55797612 V-1     T = -25 °C: 14.6508514 V-1
Break-through voltage: T = +20 °C: 405.0892017 V     T = -25 °C: 369.0490498 V
   
Notes:


Version history

Time Author Change comment
03. May 2021 10:25:03 CEST oafedulidis Updated box and position via API.
05. Feb 2021 10:56:34 CET jreher Updated box and position via API.
03. Feb 2021 18:22:08 CET jreher Updated box and position via API.
11. Aug 2020 17:33:04 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:40:04 CET jreher Updated APD location via API.
25. Nov 2019 17:15:57 CET jreher Updated box and position via API.
01. Aug 2019 12:11:15 CEST spankonin Updated APD batch assignment via API.
25. Jul 2019 12:06:12 CEST markus.moritz
05. Jul 2019 13:44:47 CEST jreher Updated APD location via API.
01. Jul 2019 14:30:52 CEST spankonin Updated APD batch assignment via API.
03. Jan 2019 00:12:32 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:12 CET Tobias Imported from Hamamatsu datasheet.