RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2517028833 - Archived data from Tue, 11. August 2020 17:33:02 CEST


This is all the information about APD 2517028833. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2517028833
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 1910021034/2517028833
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: G11
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 381.8 V
Dark current: 5.2 nA
   
Screening Logistics:  
Available: No
Storage Box: 64
Position in Box: 15
EP1 batch: 41
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.0932877 V     T = -25 °C: 345.7893046 V
Voltage for Gain 150: T = +20 °C: 388.9250569 V     T = -25 °C: 353.1697694 V
Voltage for Gain 200: T = +20 °C: 393.2794644 V     T = -25 °C: 357.3118127 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.595879352 V-1     T = -25 °C: 5.006430613 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.093305869 V-1     T = -25 °C: 9.306576555 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.14373012 V-1     T = -25 °C: 14.74350759 V-1
Break-through voltage: T = +20 °C: 407.6346444 V     T = -25 °C: 371.3756636 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:56:34 CET jreher Updated box and position via API.
03. Feb 2021 18:22:07 CET jreher Updated box and position via API.
11. Aug 2020 17:33:02 CEST jreher Updated APD characteristics via API.
03. Apr 2020 09:46:07 CEST jreher Assigned to capsule by script
13. Feb 2020 14:23:55 CET jreher Updated box and position via API.
27. Nov 2019 19:40:04 CET jreher Updated APD location via API.
25. Nov 2019 17:15:57 CET jreher Updated box and position via API.
01. Aug 2019 12:11:14 CEST spankonin Updated APD batch assignment via API.
25. Jul 2019 12:01:41 CEST markus.moritz
05. Jul 2019 13:44:47 CEST jreher Updated APD location via API.
01. Jul 2019 14:30:52 CEST spankonin Updated APD batch assignment via API.
03. Jan 2019 00:12:32 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:12 CET Tobias Imported from Hamamatsu datasheet.