RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2517028825 - Archived data from Wed, 16. June 2021 15:59:35 CEST


This is all the information about APD 2517028825. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2517028825
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G10
Break-through voltage: 406 V
Voltage for Gain 100 (T=+25°C): 378.7 V
Dark current: 5.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 64
Position in Box: 2
EP1 batch: 41
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 378.5278111 V     T = -25 °C: 343.5091629 V
Voltage for Gain 150: T = +20 °C: 386.2918214 V     T = -25 °C: 350.7978745 V
Voltage for Gain 200: T = +20 °C: 390.620146 V     T = -25 °C: 354.8740385 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.488697393 V-1     T = -25 °C: 4.794860921 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.818326374 V-1     T = -25 °C: 9.868365186 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.45838865 V-1     T = -25 °C: 15.86647896 V-1
Break-through voltage: T = +20 °C: 405.3462332 V     T = -25 °C: 369.0991409 V
   
Notes:


Version history

Time Author Change comment
29. Mar 2022 12:39:18 CEST oafedulidis Assigned to capsule by script
16. Jun 2021 16:03:10 CEST oafedulidis Updated box and position via API.
16. Jun 2021 15:59:35 CEST oafedulidis Updated box and position via API.
16. Jun 2021 15:52:13 CEST oafedulidis Updated box and position via API.
03. May 2021 10:25:03 CEST oafedulidis Updated box and position via API.
05. Feb 2021 10:56:33 CET jreher Updated box and position via API.
03. Feb 2021 18:22:06 CET jreher Updated box and position via API.
11. Aug 2020 17:33:01 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:40:03 CET jreher Updated APD location via API.
25. Nov 2019 17:15:56 CET jreher Updated box and position via API.
01. Aug 2019 12:11:14 CEST spankonin Updated APD batch assignment via API.
25. Jul 2019 11:57:15 CEST markus.moritz
05. Jul 2019 13:44:47 CEST jreher Updated APD location via API.
01. Jul 2019 14:30:51 CEST spankonin Updated APD batch assignment via API.
03. Jan 2019 00:12:32 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:12 CET Tobias Imported from Hamamatsu datasheet.