RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2516028814 - Archived data from Wed, 03. February 2021 18:22:06 CET


This is all the information about APD 2516028814. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2516028814
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2705030374/2516028814
Unit: #1696 (barcode 1309017584)
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: C04
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 379.7 V
Dark current: 5.2 nA
   
Screening Logistics:  
Available: No
Storage Box: 64
Position in Box: 1
EP1 batch: 41
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 19. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.1350773 V     T = -25 °C: 344.8993472 V
Voltage for Gain 150: T = +20 °C: 387.9499156 V     T = -25 °C: 352.2977464 V
Voltage for Gain 200: T = +20 °C: 392.297495 V     T = -25 °C: 356.4530698 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.610990697 V-1     T = -25 °C: 4.967045235 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.093014215 V-1     T = -25 °C: 9.26146189 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.21663412 V-1     T = -25 °C: 14.50347663 V-1
Break-through voltage: T = +20 °C: 407.2092637 V     T = -25 °C: 371.4547167 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:56:32 CET jreher Updated box and position via API.
03. Feb 2021 18:22:06 CET jreher Updated box and position via API.
29. Jan 2021 10:27:12 CET jreher Assigned to capsule by script
06. Oct 2020 16:52:31 CEST jreher Updated box and position via API.
11. Aug 2020 17:33:00 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:40:03 CET jreher Updated APD location via API.
25. Nov 2019 17:15:56 CET jreher Updated box and position via API.
01. Aug 2019 12:11:31 CEST spankonin Updated APD batch assignment via API.
25. Jul 2019 11:53:06 CEST markus.moritz
05. Jul 2019 13:44:46 CEST jreher Updated APD location via API.
01. Jul 2019 14:30:51 CEST spankonin Updated APD batch assignment via API.
03. Jan 2019 00:12:31 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:12 CET Tobias Imported from Hamamatsu datasheet.