RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0724007186 - Archived data from Tue, 11. August 2020 17:34:10 CEST


This is all the information about APD 0724007186. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0724007186
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 0724007186/2403026125
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: E12
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 381.7 V
Dark current: 11.2 nA
   
Screening Logistics:  
Available: No
Storage Box: 188
Position in Box: 1
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: 09. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 04. May 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 05. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.1702078 V     T = -25 °C: 346.5449639 V
Voltage for Gain 150: T = +20 °C: 390.0297525 V     T = -25 °C: 353.8366636 V
Voltage for Gain 200: T = +20 °C: 394.3866909 V     T = -25 °C: 357.9507738 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.499256108 V-1     T = -25 °C: 5.145857117 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.731465749 V-1     T = -25 °C: 9.329823173 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.16638469 V-1     T = -25 °C: 15.11300175 V-1
Break-through voltage: T = +20 °C: 410.1033589 V     T = -25 °C: 373.3792416 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:12:33 CET jreher Updated box and position via API.
11. Aug 2020 17:34:10 CEST jreher Updated APD characteristics via API.
03. Apr 2020 10:07:08 CEST jreher Assigned to capsule by script
20. Feb 2020 13:34:49 CET jreher Updated box and position via API.
27. Nov 2019 20:02:16 CET jreher Updated APD location via API.
25. Nov 2019 17:25:40 CET jreher Updated box and position via API.
13. Aug 2019 12:17:10 CEST jreher Updated APD location via API.
05. Aug 2019 17:05:34 CEST jreher Updated APD batch assignment via API.
10. Jul 2019 11:17:42 CEST markus.moritz
22. Jun 2016 15:22:31 CEST Tobias Imported from Hamamatsu datasheet.